Welcome to the official website of Qinghao Electric Co., Ltd.!

20+ years professional R&D and production experiences

World-Class Transformers, Smart Solutions

7*24H Service Hotline:

(+86)136 5236 0047

News & Information

SAT Environmental Compliance & Documentation

Released: 20/2/2023 18:18:00   Visits:1872

Except for pre-test preparation, electrical and functional tests, transformer site acceptance tests (SAT) should also include environmental compliance and documentation.

Environmental Compliance

  1. Noise Level Measurement: Confirm that the noise generated by the transformer during operation complies with local regulations.

  2. Vibration Assessment: Measure vibrations to ensure they are within acceptable limits to prevent structural damage or disturbance to the surroundings.

Documentation and Reporting

  1. Test Reports: Compile detailed reports of all tests conducted, including results, deviations, and corrective actions taken.

  2. Acceptance Criteria: Define and document the acceptance criteria for each test in advance, and confirm that these have been met.

  3. Final Approval: Obtain sign-off from both the installer/manufacturer and the client acknowledging successful completion of the SAT.

It's essential to follow industry standards (e.g., IEEE, IEC) and specific project requirements throughout the testing process. Any deviations from expected results should be thoroughly investigated and resolved before final acceptance.


contact

Pre:SAT Electrical & Functional Tests

Next:Transformer Lifespan

Leave Comments:

Records:

There is No Data!
TOP